AALBORG PORTLAND(ANQING)CO.,LTD.

中文EN

  • WHAT WE DO

    [Pre-cast] Penn State Hershey Medical Center Parking Garage


    Within the context of the architecturally significant campus, the white precast concrete made with Cementir’s Lehigh White Cement has been selected by architect of 
    Lamar Johnson Collaborative for constructing the parking garage.
        
    The 3-D wave elements borrowing the landscaping inspirations of hills and river were produced by High Concrete Group. Design team found ways to maximize formworks while keeping engineering stability and minimizing design changes to significantly achieve the cost-saving requirements. The project is one of the 2021 PCI Building Award Winners.


    AWARDS    
    -2021 PCI Design Awards
    -Building Award: Best All-Precast Concrete Parking Structure

    KEY PROJECT ATTRIBUTES

    -Three-dimensional curved spandrels reflect Pennsylvania’s rolling hills.
    -Designers used Rhino and Tekla tools to meet exact weight requirements.
    -The 8-ft overhang cantilever entrance was created in two pours to accommodate its massive depth.

    PROJECT/PRECAST SCOPE

    -Build a 1235-space, four-story, all–precast concrete parking structure with room for expansion.
    -The project included 771 total pieces of precast concrete made with Aalborg White cement.
    -Erection was completed in four months.

    Location

    USA

    Completion Year

    2020

    White Cement Product

    Lehigh White Portland Cement

    Industry

    Building / Commercial Structural

    Application

    Precast concrete / Concrete elements (PRE/CE)

    Descriptions

    Precast concrete cladding

    Manufacture

    High Concrete Group

    Architects

    Lamar Johnson Collaborative, Chicago, Ill.

    在线客服

    热线:

    86 556- 5368180

    QQ在线

    QQ在线